İçeriğe geç
CableJob

OSP Technician — Aerial and Underground

Shannonlink Communications Ltd · Limerick, İrlanda

Ekip alımıSahada€400 – €540 gün başı
**The work** Crew work on a rural fibre build across Limerick, Clare and North Tipperary. Aerial installation on existing poles, make-ready and pole replacement where needed, underground duct work on the road crossings, and cable hauling on both. The rate quoted is for a two-person crew with a van. **What you need** - Two technicians with pole climbing and harness training in date. - Three years or more of aerial and underground fibre installation. - Safe Pass for both, and a Signing, Lighting and Guarding ticket for whoever sets out the works. - Your own van; drums, trailers and consumables are supplied. - Public liability cover at the level stated in the subcontract terms. **What we offer** A crew day rate in the band above paid weekly against a signed timesheet, with materials, plant and traffic management supplied and a programme funded to 2028. We charge the crew nothing, at any point. **How to apply** Apply through CableJob. No agencies on this posting, and no fee is ever charged to an engineer.

İlan bilgileri

Sözleşme tipi
Ekip alımı
Çalışma şekli
Sahada
Konum
Limerick, İrlanda
Ücret
€400 – €540 gün başı
Yayın tarihi
2026-09-20
Son başvuru
2026-10-28
Referans
E49FXF

Yetkinlikler

  • Trafik yönetimi, işaretleme, aydınlatma ve koruma
  • Direğe tırmanma (ahşap/beton)
  • Havai kablo montajı (lashing, çelik halat)
  • Fiber kablo çekme (vinç, gerilim takibi)
  • Yeraltı boru hattı ve alt kanal döşemesi
  • Emniyet kemeri kontrolü ve düşmeyi önleme

İşveren hakkında

Shannonlink Communications Ltd